Full Wiring 8 — Bed control box + cab power section

wheel / pinch = zoom · drag = pan
SHEET 8: BED CONTROL BOX AND CAB POWER SECTION (DRAFT) Logic stays in the waterproof box in the bed · heavy power is in the cab · everything enters through 3 glands and 1 breather CAB POWER SECTION pack location TBD · details on Sheets 1 and 6 Cab + / - bus fused bed feed, fuse + gauge TBD Bus voltage sense front bus + cab bus, Sheet 6 Control wires cross the cab wall through a grommet and loom. Keep heavy cable away from Cat5e and CAN. OTHER RUNS Front / Switch A the ONE cab to bed Ethernet run Tailgate panel camp switches, Modbus IO 8CH BOX WALL BED CONTROL BOX, Lost Creek medium IP67 low current only · backplate or DIN rail · foam removed BED BOARD (8DI-8DO) camp loads + bus voltages RS485 master · Ethernet · 12V fed DI1 SPARE SPARE DO1 DI2 SPARE SPARE DO2 DI3 SPARE Rack lights 1 DO3 DI4 SPARE Rack lights 2 DO4 DI5 SPARE Rack lights 3 DO5 DI6 SPARE Tent lights DO6 DI7 SPARE Water pump DO7 DI8 SPARE SPARE DO8 Fuse block ferrules or WAGO 5A feeds DC Monitor 33931 front and cab bus sense Modbus IO 8CH optional, RS485 G1 G2 G3 breather, MANDATORY relay, via G3 relay, via G3 relay, via G3 relay, via G3 relay, 10A, 16 AWG fridge / fan later G3: light circuits, one bundled cable Waterproof junction near the lights, fans out to: 3 rack sets, tent lights, water pump CONFIRM Old sheet said 6 light circuits. Doc map is 3 rack + tent + pump + 1 spare (shown). Where do these relays live? Sheet 7 said a bed relay box, this box is logic only. Bed feed fuse and gauge still TBD. GLAND RULES Glands on the bottom or side, never the lid · drip loop below each gland · match gland to cable size · one breather or the box pulls water past its seals when it cools 12V control sense Ethernet RS485 DO

open the PDF version ›

‹ prevnext ›