☰ Menu
🏠 Overview
0. THE BINDING CONSTRAINT — READ THIS FIRST
1. PROJECT OVERVIEW
2. HARDWARE — ALREADY OWNED (No Cost)
3. CARPUTER — HARDWARE TO PURCHASE
4. SYSTEM ARCHITECTURE — THREE TIERS
5. POWER ARCHITECTURE (the keystone)
6. ESP32 NODE NETWORK (Tier 0)
7. CAMERA SYSTEM + NVR
8. CAN BUS INTEGRATION
9. SOFTWARE STACK
10. THERMAL MANAGEMENT
11. HOME RAG SERVER (HP Z440 #1)
12. OFF-GRID MESH + REMOTE ACCESS (Phase 2/3)
13. PENDING ACTIONS
14. PHASED ROADMAP
15. COST SUMMARY
16. ARCHITECTURE AT A GLANCE
17. MASTER PARTS LIST (BOM) (rev 3.43)
▣ Wire Diagrams
Full Wiring 6 — Trunk and bank monitor
+
-
Fit
100%
wheel / pinch = zoom · drag = pan
SHEET 6: TRUNK AND BANK MONITOR (DRAFT)
One fused link between the front bus and the cab bus · no FEENCE, no contactor, nothing switched · carries 125A at most, never inverter current
ENGINE BAY
CAB POWER SECTION (pack location TBD)
BED CONTROL BOX (IP67, Sheet 8)
FRONT - BUS
CAB - BUS
TRUNK - 2 AWG: never fused, never switched
ONE chassis bond, 2 AWG
FRONT + BUS
CAB + BUS
125A
125A
W5 TRUNK + 2 AWG, length TBD
DC-DC
40A in, Sheet 1
Front box
Sheet 2
Vatrers, solar, shore,
inverters: all on the cab bus
(Sheet 1)
DC MONITOR 33931
ch1 = front bus, ch2 = cab bus
0-36V
not the main shunt
BED ESP32 BOARD
reads both voltages
logs and alerts
does not switch the trunk
ch1 front bus sense
22 AWG, 1A fuse at tap
ch2 cab bus sense
22 AWG, 1A fuse at tap
RS485
Ethernet to front
+ power
- power
voltage sense
RS485
Ethernet
AUTOMATIC CHECKS, ALL SHEETS: 43 pass · 6 warnings · 1 failure
! Trunk drop about 0.40V at 64A, guessing 20 ft: measure, may need 1/0
WHAT THE TRUNK DOES
Plain fused link. Nothing on it opens or closes in normal use.
Back to the Vatrers: DC-DC charge, up to 40A.
Forward to the front box: about 64A estimated with everything on.
Inverters stay on the cab bus, so their current never uses the trunk.
REMOVED
FEENCE and W3 · contactor · RLY-O5 · RLY-PC · pre-charge resistor
Merge bands and sequence · combiner override switch
Bed board DO1, DO2 and DI1 are now spare.
Chassis bond moved to the front - bus (it was at the FEENCE).
MAIN DISCONNECT
It opens the packs from the cab bus.
It does not make the system dead on its own. DC-DC, MPPT and shore
charger all stay connected on the bus side.
Before work: engine off, shore unplugged, solar off, then open it.
FAULTS
Front-V and cab-V more than about 1V apart: a trunk fuse is open.
Engine off: front box is dark. Engine on: DC-DC holds the front
bus but nothing reaches the packs. Bed board logs it.
Network is front-fed, so that alert may not send until it is fixed.
Packs off (BMS trip): front box and ESP32 go dark. No front backup.
BMS recovery: remove load, rest 30 minutes. Still off: 0V-capable
charger, or a 12-14.6V battery in parallel for about a minute.
Load shedding: build doc 5.4, not changed here.
CONFIRM
Trunk length is a guess (20 ft). Measure, then recheck the drop.
Test that the DC-DC starts with the packs low.
Pack location is not settled. Cable lengths wait on that.
open the PDF version ›
‹ prev
next ›