Full Wiring 6 — Trunk and bank monitor

wheel / pinch = zoom · drag = pan
SHEET 6: TRUNK AND BANK MONITOR (DRAFT) One fused link between the front bus and the cab bus · no FEENCE, no contactor, nothing switched · carries 125A at most, never inverter current ENGINE BAY CAB POWER SECTION (pack location TBD) BED CONTROL BOX (IP67, Sheet 8) FRONT - BUS CAB - BUS TRUNK - 2 AWG: never fused, never switched ONE chassis bond, 2 AWG FRONT + BUS CAB + BUS 125A 125A W5 TRUNK + 2 AWG, length TBD DC-DC 40A in, Sheet 1 Front box Sheet 2 Vatrers, solar, shore, inverters: all on the cab bus (Sheet 1) DC MONITOR 33931 ch1 = front bus, ch2 = cab bus 0-36V not the main shunt BED ESP32 BOARD reads both voltages logs and alerts does not switch the trunk ch1 front bus sense 22 AWG, 1A fuse at tap ch2 cab bus sense 22 AWG, 1A fuse at tap RS485 Ethernet to front + power - power voltage sense RS485 Ethernet AUTOMATIC CHECKS, ALL SHEETS: 43 pass · 6 warnings · 1 failure ! Trunk drop about 0.40V at 64A, guessing 20 ft: measure, may need 1/0 WHAT THE TRUNK DOES Plain fused link. Nothing on it opens or closes in normal use. Back to the Vatrers: DC-DC charge, up to 40A. Forward to the front box: about 64A estimated with everything on. Inverters stay on the cab bus, so their current never uses the trunk. REMOVED FEENCE and W3 · contactor · RLY-O5 · RLY-PC · pre-charge resistor Merge bands and sequence · combiner override switch Bed board DO1, DO2 and DI1 are now spare. Chassis bond moved to the front - bus (it was at the FEENCE). MAIN DISCONNECT It opens the packs from the cab bus. It does not make the system dead on its own. DC-DC, MPPT and shore charger all stay connected on the bus side. Before work: engine off, shore unplugged, solar off, then open it. FAULTS Front-V and cab-V more than about 1V apart: a trunk fuse is open. Engine off: front box is dark. Engine on: DC-DC holds the front bus but nothing reaches the packs. Bed board logs it. Network is front-fed, so that alert may not send until it is fixed. Packs off (BMS trip): front box and ESP32 go dark. No front backup. BMS recovery: remove load, rest 30 minutes. Still off: 0V-capable charger, or a 12-14.6V battery in parallel for about a minute. Load shedding: build doc 5.4, not changed here. CONFIRM Trunk length is a guess (20 ft). Measure, then recheck the drop. Test that the DC-DC starts with the packs low. Pack location is not settled. Cable lengths wait on that.

open the PDF version ›

‹ prevnext ›