☰ Menu
🏠 Overview
0. THE BINDING CONSTRAINT — READ THIS FIRST
1. PROJECT OVERVIEW
2. HARDWARE — ALREADY OWNED (No Cost)
3. CARPUTER — HARDWARE TO PURCHASE
4. SYSTEM ARCHITECTURE — THREE TIERS
5. POWER ARCHITECTURE (the keystone)
6. ESP32 NODE NETWORK (Tier 0)
7. CAMERA SYSTEM + NVR
8. CAN BUS INTEGRATION
9. SOFTWARE STACK
10. THERMAL MANAGEMENT
11. HOME RAG SERVER (HP Z440 #1)
12. OFF-GRID MESH + REMOTE ACCESS (Phase 2/3)
13. PENDING ACTIONS
14. PHASED ROADMAP
15. COST SUMMARY
16. ARCHITECTURE AT A GLANCE
17. MASTER PARTS LIST (BOM) (rev 3.43)
▣ Wire Diagrams
Full Wiring 2 — FRONT computer fuse/relay box (pin-level)
+
-
Fit
100%
wheel / pinch = zoom · drag = pan
SHEET 2: FRONT FUSE AND RELAY BOX (DRAFT)
Each row is one circuit, left to right: feed, fuse, relay, load · every relay: 86 trigger rail, 85 sunk by a DO, 30 gang fuse, 87 load, 87a empty
O1 LATCHING, not in the relay box
TRUE MODS BOX A, board driven, 8 AWG feed
gangs 4-6: SPARE (F4 and F10 moved to the bed box)
TRUE MODS BOX B, lights, dash module driven, 8 AWG feed
KC KIT RELAY
ALWAYS-ON ATO BLOCK, no relays, 10 AWG feed (see check)
W4 from
front + bus
6 AWG, 60A fuse
at the bus
BOX GND BAR, to front - bus
TRIGGER RAIL, 20 AWG
F1 10A
D-151 latching
S / R pulses, 0W hold
DO1 S / DO5 R
12V to 19V converter
14 AWG
~7A
F2 7.5A
RLY-O2
30 in, 87 out
DO2
Accessory circuits
16 AWG
~5A
F3 10A
RLY-O4
30 in, 87 out
DO4
Switch B PoE PSU
14 AWG
~7A
F5 5A
RLY-DC
30 in, 87 out
DO6
VEVOR DC-DC D+
18 AWG
~0.5A
F6 7.5A
RLY-RK
30 in, 87 out
M-DO1
Rock lights
16 AWG
~5A
F7 7.5A
RLY-UB
30 in, 87 out
M-DO3
Underbody
16 AWG
~5A
F8 7.5A
RLY-PD
30 in, 87 out
M-DO4
Pods
16 AWG
~5A
F9 7.5A
RLY-AM
30 in, 87 out
M-DO5
Amber / marker
16 AWG
~5A
KC 25A
KC kit relay
trig + 30 + 87 per kit
M-DO2 + dash
KC rack 216W
12 AWG
~18A
F11 5A
All pin 86 + D-151 V+
20 AWG
~2A
F12 3A
ESP32 + dash Modbus
18 AWG
~1.5A
F13 3A
Pi 5V buck
18 AWG
~1A
F14 3A
Cudy + Switch A
18 AWG
~2A
CHECK RESULTS FOR THIS BOX
Always-on block feed: 10 AWG protected at 60A (limit 49A)
Front box with everything on: about 64A estimated vs 60A fuse on W4
D-151 contacts are 8A but F1 is 10A: a load the fuse allows can overheat the relay
Fix for the 10 AWG feed: run 8 AWG, or fuse it at 30A.
Fix for W4: 80A fuse on the 6 AWG cable,
or keep lights off together.
Fix for D-151: 8A fuse, after metering real converter draw.
NEW ON THIS SHEET
RLY-DC, Box A gang 3, F5 5A, driven by front DO6.
87 goes to the VEVOR D+ terminal. Test that D+ off stops
charging at 14V. If not, this row becomes a switched feed.
O1 now uses DO1 (set) and DO5 (reset).
RULES
Coil about 150mA vs 500mA DO limit.
Diode-suppressed coils: 85/86 polarity is strict.
D-151: never pull S and R low together. Sy read-back to DI7.
KC relay: dash switch OR M-DO2 through diodes, so the
switch works with the computer dead. Front board
blocks the rack above about 5 mph on road.
M-DO6 master isolation: output reserved, relay not drawn.
Triggers on solid Cat5, 20-22 AWG. Loads 14-16 AWG.
12V, width = gauge
trigger rail
ground
Amps are estimates. Yellow relay = new. Purple text = which output pulls pin 85.
open the PDF version ›
‹ prev
next ›